A PRT global guideway network is all electric over 30 times faster transportation.

7000 Northwest 27th Street, Lincoln Nebraska

402-416-5235

Affordable, sustainable, forever, this may be plan A. There is no plan B.

Global mining and processing

The guideway ideas comes along with the deep geothermal automated local distribution system.

  As electric generation shafts are sunk everywhere Proposed is a automated sampling system that does on the spot visual and spectrograhic  catigorizing for further tests if interesting.  Locating ore veins or pockets allows easier going in with guideway Pier and span systems being used for direct mine and quary access by PRT vehicles.